BISHOP MCNAMARA HIGH SCHOOL
6800 Marlboro Pike, Forestville, MD
(Athletic Director Tony Johnson 301-516-6132)

The removal of the existing track and the installation of a new DOC SS30 Sandwich System running track.
DOC has the experience to handle all the perimeter erosion sediment control
work. This work will prevent the rain run-off from washing dirt and debris out on the new
track surface. This is very important and Bishop McNamara doesn't have to bring in a separate contractor to handle this work
because DOCSSC can handle it all turnkey saving the school money.

The old track surface was removed and the asphalt subsurface is now being cleaned and prepared for
the new DOC track.

__________________________________________________________________________________
Paving the Base Mat of the DOC SSC300 Sandwich System


Applying the DOC Seal Coat to the base mat

Flood & Chip process

Track striping process to add the events to the new track
surface
The Bishop McNamara Mustang's will train and compete on
their new DOC SS30 running track

We offer track repair and re-striping services. If you have an existing running track and need to have work done